Brattön
The Brattön wind farm comprises a total of six 2.5 MW Nordex (N90) wind turbines. Opening ceremony in June 2010.
Information about the wind farm
- Startdate
- Aug 2010
- Yearly production
- 34 GWh
- Total effect
- 15 MW
- Wind turbines
- 6 st
- Make
- Nordex (N90)
- The Brattön wind farm comprises a total of ten wind turbines.
- In the first phase, the Company have built six 2.5 MW Nordex (N90) wind turbines.
- The wind turbines were assembled in March/April 2010
- Opening ceremony in June 2010.
- The remaining four wind turbines (stage II) have not been ordered due to limited grid connection.